Demo Day: Digging and More Bathroom Stuff

We had a beautiful sunny warm day on Jan. 3 for our first group demo day of the year. We had just a few friends make it out for a very productive day.

Our buddy Jacob knocked out all that was left in the bathroom getting us set for the next phase of prepping the plumbing.

BedroomandBathroom JacobDemoBathroom AtticandBathroom

While that was going on the rest of the guys worked on our new beam that was installed in the attic to support the ceiling as we take more walls out.

WorkinginAttic

We also had just purchased some new garden tools and I’ve been anxious to get started on that. So I took advantage of the warm sunshine and tackled removing a bush in the front. It turned out to be a beastly thing with very deep, woody roots and required a saw to get the bulk of it out. The photo doesn’t give it justice into how much work it took to remove. The soil here is compacted and cement like with plenty of large rocks mixed in too.

DiggingUpPlants

Taking a break from that I switched to the other side of the stairs and planted some paperwhites and allium. I can’t wait to see them blooming soon.

PlantingAllium

Backyard

More stacks of magazines found in the attic. It’s been neat to see what gets left behind in a house and what they tell you about previous tenants.CarMagazines DiningRoom GuttedBathroom LivingRoom_tacos KitchenView

The nail collecting continues. We transition all the cups to a big bucket and we’ve already half filled this 5 gallon one.

Collecting_Nails

Advertisements

Demo Day: Bathroom

Well friends, it finally happened. After having made a number of holes in the walls and removing the tile, the entire bathroom was demolished. Well for this post it was completely gutted and most of the boards removed. But it’s current state (not pictured) is that the bathroom is GONE.

So back to the status of the bathroom according to the photos… On this day we moved the tub out, removed the sink, and carried out the toilet. Many of the walls were already gone but we tried to take a few more out with our last bits of the days energy.

Bathroom_BeforeRemovalHere’s the Before picture. Where we still had the plastic sheets up to try and keep it semi private if needed.

TubLeaving

 

 

 

 

The tub was removed via the hole into the front bedroom that just so happened to fit it’s width perfectly. From the looks of the wood that had been placed underneath it was a semi new addition so that’s probably why the hole was there in the first place.RemovingTub LonelyToiletRemovedSink_CounterHere’s the sink in the Master Bedroom just hanging out for now. It will be stashed in the garage once we’ve cleaned that place out to fit more trash. Bathtub_inthebedroom

And the tub is now in the front bedroom and has become a place to store chopped wood. Again, a temporary solution until we do more cleanup in the garage. Luckily we’ve figured out a few solutions for getting more trash moved out other than the once a week pickup of our normal trash service. More on that later.

Leftover_tubpiping

 

Here’s the pipe that remains in the wall until we have time to cut it out. LonelyToilet

All that was left was the lonely toilet. We weren’t able to remove it on this visit because we still needed to turn the water off to the toilet. Sooo it was technically still a useable bathroom. It just required asking everyone to stop their work and go outside. 🙂

 

 

 

 

Demo Day: Removing Bathroom Tile

RemovingTile2

Have you ever been frustrated with a project that you just wanted to smash to pieces? Maybe a printer that just wouldn’t work or even just day to day stress that needed to be directed somewhere? Then I highly recommend removing tile. It’s affixed with concrete if you didn’t know, which requires some major smashing.

But be warned it makes a mess.

We got super lucky in that we found a way to remove the tile without too much bashing. We had removed all the shiplap from the front room leaving the hidden backside of the bathroom wall exposed. AKA we could see all the nails and hammer them out before attempting to remove the drywall and tile.

In one of the photos below you can see a grey square in the wall. That’s where we exposed the concrete side of the tile allow us to push/pull the entire piece off the wall in one go. And boy was that thing heavy. After removing the side piece, the back wall that partially surrounded the window was also able to be pried off. It helped that the tub at that point was unattached to anything at this point too.

Just you wait till the next few posts. The bathroom is gone. As in gone, gone. It’s really exciting.

This slideshow requires JavaScript.

Demo Day: Removing the Master Closet

_MG_0893

Do you remember that closet in the Master bedroom that we also lovingly referred to as the only attic access? Well on this demo visit we knocked her out! She is gone as well as the nasty drop ceiling near the back door that was simply silly.

The other project we undertook for this visit was switching the blinds. They were originally installed above the windows on the framing. Since we need to move forward with removing drywall and ship-lap we needed to remove the window frames. But doing that would mean losing the privacy/safety of blinds when we’re not at the house. So to fix that problem we re-installed the windows to fit within the actual window framing. That required trimming them down a bit. But they work!

This slideshow requires JavaScript.

Demo Day 4: Removing the Art Wall

This slideshow requires JavaScript.

Do remember this post where we removed the art on the wall? Well this demo day goes along with that one. Now you can see how delayed I’ve been in getting demo/progress posted. But this long weekend is definitely helping with productivity. We’re catching up to real time progress!

On this day it was a lot of re-evaluating our progress. We had removed a fair amount of drywall and ship-lap and were now needing to catch up on a few other walls we’d skipped. So it was back to removing drywall and getting that dusty mess cleaned up for…more ship-lap removal. More of the same.

Psst. There’s also a sneak peek in the photo gallery above of a change in the garage we are STOKED about.

 

Demo Day 3

Knob and tube wiring

Or at least the 3rd photo grouping on my camera. This day we arrived focused and just jumped into working. So I didn’t capture many in process photos. Also we’re still deep in work to remove ship-lap from all the walls. Below are a few photos of the after. We found a few more areas hiding the old knob and tube wiring, which relies on an air gap (provided by the knobs and tubes) to function safely. Check out the photos and it will make more sense. Folks were certainly trusting of their houses and that no creatures would get in and chew it or build nests to cause a fire.

After reading through this post you might be feeling like little has changed. Read back to this, and this post.

This slideshow requires JavaScript.

The Night Demo

_MG_0821

The demo days are starting to run together. Each time we make significant progress but it’s technically still the same work so they are hard to distinguish as different events in my head. Anyway. This demo day wasn’t a big group demo day but a night visit to the house to make progress. There was some traveling on the calendar and we wanted to make sure we worked a bit before we left.

This night we removed a few more boards from the master bedroom wall adjoining the bathroom. It was dark and maybe a little tough to work in minimal light but do-able. Fun story though. We found a friend in the wall. Well, what’s left of him. We found a full skeleton nestled into it’s home in the wall. For the rest of the night I had to make sure I didn’t overthink how big it could have been when it was alive or question the possibility of others. EEK!

We also found a few random pipes in the wall that as far as we can tell don’t attach to anything. Or they were an excessive amount of pipe added to allow air to escape while the water drains. Either way, a curious discovery.

This slideshow requires JavaScript.

House Demo Day 2

We absolutely love getting help from friends. Using the excitement and momentum from the start of this big project we had a second demo day the next weekend. A lot more boards came down and were hauled off to the garage. Whoever originally built the house used so many nails in the boards that the garage is looking like a scene from Final Destination ( or so I would guess because I haven’t watched those movies). We’ve begun remedying that situation but more on that later.

DemoDay2_BathroomTileRemoval2

The house demolition for this day also included busting the tile in the bathroom. Jeremy and Kristen were our fearless tile crushers. There is now a gaping hole revealing the shower pipe and the master bathroom. We didn’t think ahead about the fact we now have a less than private bathroom for people to use while they’re working. Oops.

DemoDay2_FrontBedroom2 DemoDay2_DominoesPizza

Another visible milestone was having half the kitchen counter removed! And so many cockroaches came out! ick ick ick. (The house will be RAIDed ASAP.) You may have noticed that it cut the room in half and created an odd path through the house. No more! But we do have to be aware of the hole just behind the backdoor where we can see down into the crawlspace. That’s also new.

DemoDay2_KitchenCounterRemoved DemoDay2_KitchenFloor

And this demo day had a special guest! Waffles the corgi came by to keep us smiling in the cold and offer lots of playtime (read wanted distraction). He was just too cute not to play with especially when he kept running off with bits of wallpaper. The house wasn’t going anywhere so of course we played. (Thank you Scott & Liz!)

DemoDay2_WafflesTheCorgi2 DemoDay2_WafflesTheCorgi

We seriously have the greatest friends for coming to help with this epic project. Hopefully the endless supply of pizza and our endless thanks is enough to keep them happy. And definitely future hangouts when the house is all finished. Looking forward to that for sure.

 

This slideshow requires JavaScript.

It might help seeing how things have progressed by going back and seeing the Before Photos, and House Demo Day 1.

 

House Demo Day 1

 

Tools

The first demo day was a fantastic success! We had 7 friends stop by throughout the day to help with gutting the house for a few hours each. It may not seem like much but that meant we accomplished 3.5 times more than if it had been just the two of us. Our friends are the best!

Fueled by Einstein Bros Bagels in the morning and Dominoes Pizza and Lonestar in the afternoon we tore out drywall and mostly eliminated one whole wall between the living and dining rooms.

Because this is an old home, as in built in the 1920s, we discovered a quirk with the walls. Under the drywall was shiplap wood adding a bit more work to the demo process. Other than having way too many nails in them it will be fanstatic wood for future projects like garden beds or a dog house. 🙂

FrontBed Dining_Panorama1

Then we discovered that there is no insulation in the house. Some of the wood has termite damage, but no termites thankfully, and the electrical had been updated but rather poorly so the breaker box is a sketchy game of guess which light/outlit is connected.

Then there was the charm of finding some old education books from the 1950s.

HouseFinds

All in all, a satisfying day of progress. Check out more photos from the first day of demolition below.

This slideshow requires JavaScript.

*This is not a sponsored post. If you’d like to sponsor the blog or donate to the project, food, tools, time, please contact us!